MICRONIZATION AND GASIFICATION PROJECT - DUNKIRK - BIOTFUEL
MICRONIZATION AND GASIFICATION PROJECT - DUNKIRK - BIOTFUEL

MICRONIZATION AND GASIFICATION PROJECT - DUNKIRK - BIOTFUEL

0 €
Turnkey project for the creation of second-generation fuel Micronization, recipe implementation, and gasification - Truck reception area - Sandwich belt conveyor - Storage silos for primary products - Connecting conveyors to micronization - Micronization line (including primary grinder, secondary rotary grinder, dust removal, dryer, ...) - Pneumatic connecting conveyor to silos of micronized products - Extraction and creation of recipe batches - Pneumatic connecting conveyor to mixer - Feed chute for the gasifier This set includes the lots: Civil engineering, centralized dust removal, fire detection and prevention
Similar products
1/15
EON - BIOMASS PROJECT PROVENCE 4 - GARDANNE - FRANCE
EON - BIOMASS PROJECT PROVENCE 4 - GARDANNE - FRANCE
Biomass Power Plant Turnkey Biomass Handling System - Log grinding station - 1 curvoduc™ connection of 540 m - curve radius 800 m - 4 Class A truck r...
FR-49481 Verrières En Anjou Cedex
SEA INVEST GAND - BELGIUM
SEA INVEST GAND - BELGIUM
2 dusted hoppers - motorized on rails Flow rate: 600 t/h Product: clinker, slag, gypsum, limestone...
FR-49481 Verrières En Anjou Cedex
TRAIN LOADING - GDANSK - POLAND
TRAIN LOADING - GDANSK - POLAND
Product: Coal Flow rate 2,400 t/h...
FR-49481 Verrières En Anjou Cedex
CARIBBEAN ENERGY - GUADELOUPE - FRANCE
CARIBBEAN ENERGY - GUADELOUPE - FRANCE
Coal plant, screening, grinding, storage, truck unloading Flow rate: 150 t/h...
FR-49481 Verrières En Anjou Cedex
SEA INVEST - BORDEAUX - FRANCE
SEA INVEST - BORDEAUX - FRANCE
Handling and storage circuit for soybean meal Flow rate: 1000 t/h...
FR-49481 Verrières En Anjou Cedex
SECHE ENVIRONMENT - FRANCE
SECHE ENVIRONMENT - FRANCE
Spacing: 800 m Product: Residues Flow Rate: 150 t/h Other Features: 3 curves / radii from 350 to 900 m...
FR-49481 Verrières En Anjou Cedex
CARRIERE DU BOULONNAIS - FRANCE
CARRIERE DU BOULONNAIS - FRANCE
Chalk Warehouse Construction Process Capacity of 24,000 T...
FR-49481 Verrières En Anjou Cedex
JILIN WATER - CHINA
JILIN WATER - CHINA
Spacing: 2 km designed for 11 km + 1.2 km additional Product: Excavated material Flow rate: 820 t/h Other Features: Curvoduc™ behind the tunnel boring...
FR-49481 Verrières En Anjou Cedex
Bizerte - Tunisia
Bizerte - Tunisia
1 Stacker Product: coal Flow rate: 800 t/h...
FR-49481 Verrières En Anjou Cedex
ITALCEMENTI - BELGIUM
ITALCEMENTI - BELGIUM
Distance: 1.88 km Product: Limestone / Marl (2 supporting strands) Flow rate: 2,300 t/h for limestone - 2,300 t/h for marl Other Characteristics: 1 cu...
FR-49481 Verrières En Anjou Cedex
ST GOBAIN - FRANCE
ST GOBAIN - FRANCE
Storage and recomposition workshop for raw materials for glass wool production. Complete process of weighing, dosing, and preparing batches. 12 produc...
FR-49481 Verrières En Anjou Cedex
COMILOG - GABON
COMILOG - GABON
Distance: 2.18 km Product: Manganese Ore Flow Rate: 3,000 t/h...
FR-49481 Verrières En Anjou Cedex
AGRIAL - FRANCE
AGRIAL - FRANCE
AGRIAL - FRANCE...
FR-49481 Verrières En Anjou Cedex
METRO SUD - ITALY
METRO SUD - ITALY
Length: 2 km Flow rate: 150 t/h Minimum curve radius: 500 m...
FR-49481 Verrières En Anjou Cedex
CDF - FRANCE
CDF - FRANCE
CDF - FRANCE...
FR-49481 Verrières En Anjou Cedex

The europages app is here!

Use our improved supplier search or create inquiries on the go with the new europages app.

Download in the App Store

App StoreGoogle Play